GROWTH WITHOUT BORDERS
The pursuit of perfection and the innovative strength of our employees have ensured that DAM has been on a steady and sustainable growth path since it was founded.
GROWTH WITHOUT BORDERS
The pursuit of perfection and the innovative strength of our employees have ensured that DAM has been on a steady and sustainable growth path since it was founded.
On the way up since 2006.
In a constantly changing world of mobility, we never stand still. We are constantly expanding our technical horizons and are therefore ready for the challenges of tomorrow.
This spirit is the most important building block of our entrepreneurial future and thus also secures the jobs of our highly qualified employees.
Ing. Robert Fandler | Ing. Gerald Matzer
MANAGEMENT
On the way up since 2006.
In a constantly changing world of mobility, we never stand still. We are constantly expanding our technical horizons and are therefore ready for the challenges of tomorrow.
This spirit is the most important building block of our entrepreneurial future and thus also secures the jobs of our highly qualified employees.
Ing. Robert Fandler
Ing. Gerald Matzer
MANAGEMENT
A location with a future.
Thanks to ideal transport connections and its close proximity to the university city of Graz, our location in Gleisdorf offers plenty of space for the ideas of tomorrow.
Following the construction of our headquarters in 2012, an extensive extension was carried out in 2017. Plans for further extension in the future are already underway.
2012
Construction of own DAM company site
Office: 650 m2 | Production: 800 m2
2017
Site extension – expansion stage 1
Office: 790 m2 | Production: 2,000 m2
2025 – 2026
Fit for Future – expansion stage 2
Office: 1,940 m2 | Production: 3,800 m2
A location with a future.
Thanks to ideal transport connections and its close proximity to the university city of Graz, our location in Gleisdorf offers plenty of space for the ideas of tomorrow.
Following the construction of our headquarters in 2012, an extensive extension was carried out in 2017. Plans for further extension in the future are already underway.
2012
Construction of own DAM company site
Office: 650 m2 | Production: 800 m2
2017
Site extension – expansion stage 1
Office: 790 m2 | Production: 2,000 m2
2025 – 2026
Fit for Future – expansion stage 2
Office: 1,940 m2 | Production: 3,800 m2
ready for any challenge.
Our company structure makes it possible to implement and support projects from conceptualization, planning, procurement, manufacture and assembly through to commissioning and handover to our customers. Our flexibility and experience ensure that we can respond quickly and easily to all customer requests.
Ready for any challenge.
Our company structure makes it possible to implement and support projects from conceptualization, planning, procurement, manufacture and assembly through to commissioning and handover to our customers. Our flexibility and experience ensure that we can respond quickly and easily to all customer requests.